Customization: | Available |
---|---|
Media: | Gas |
Temperature: | High Temperature |
Still deciding? Get samples of $ !
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Step | Description |
1 | Install valve in pipeline with flow direction matching arrow on valve body. |
2 | Ensure pipes are clean, free of debris, and properly aligned before installation. |
3 | Use appropriate gaskets/seals compatible with fluid media (max 150 psi pressure). |
4 | Tighten mounting bolts evenly to 8-10 Nm torque (do not overtighten). |
5 | Connect electrical leads to coil terminals (24V DC/120V AC as labeled). |
6 | Verify voltage matches coil specification (±10% tolerance allowed). |
7 | Install drip loop in power cable to prevent water ingress. |
8 | Ground valve body when handling flammable media (use 14 AWG ground wire). |
9 | Cycle valve manually using override button (if equipped) to verify movement. |
10 | Gradually introduce media pressure while monitoring for leaks. |
11 | Maintain ambient temperature between -20°C to +55°C during operation. |
12 | Perform monthly manual cycling and visual inspection of seals. |