Customization: | Available |
---|---|
Standard: | ANSI |
Type: | Threaded Connection Flange |
Still deciding? Get samples of $ !
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Parameter | Specification | Standard |
Part Number | 03031-1300-0005 | Rosemount Standard |
Connection Size | 2 inch (NPS 2) | ASME B16.5 |
Flange Rating | Class 300 | ASME B16.5 |
Flange Face | Raised Face (RF) | ASME B16.5 |
Pressure Tap Spacing | 2-1/2 inch Centerline (CL) | AGA-3/ISO 5167 |
Tap Connection | 1/2" NPT Female | ANSI B1.20.1 |
Tap Orientation | Radial | ISO 5167-2 |
Material | ASTM A182 F316/F316L Stainless Steel | ASME Sec II |
Max Working Pressure | 740 psig (51 bar) @ 100°F (38°C) | ASME B31.3 |
Temperature Range | -40°F to 400°F (-40°C to 204°C) | Rosemount Spec |
Hydrostatic Test | 1,110 psig (77 bar) | ASME B16.34 |
Weight | 7.3 lb (3.3 kg) |
Service Temp | Recommended Gasket |
-40°F to 450°F | Graphite-filled spiral wound |
451°F to 800°F | PTFE-filled spiral wound |
Cryogenic | Stainless steel jacketed |
Bolt Size | Torque Sequence | Final Torque (ft-lb) |
3/4"-10 UNC | Star pattern in 3 stages | 120 ±5% |
Error Source | Impact on dP Accuracy |
Tap misalignment | ±0.15% of span |
Plate eccentricity | ±0.25% of span |
Surface roughness | ±0.10% of span |
Total system impact | ≤±0.5% of span |
Parameter | Wafer Flange | Conventional Flange |
Installation time | 1.5 hours | 3.5 hours |
Leak paths | 2 | 8 |
Material cost | $420 | $1,150 |
Calibration drift | <0.1%/year | 0.3-0.5%/year |
Symptom | Root Cause | Corrective Action |
Zero drift | Tap plugging | Chemical purge/steam lancing |
Asymmetric dP reading | Plate misorientation | Verify upstream sharp edge |
Flange joint leakage | Gasket compression loss | Retorque/replace gasket |