Customization: | Available |
---|---|
After-sales Service: | 1 Year |
Warranty: | 1 Year |
Still deciding? Get samples of $ !
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Step | Description |
1 | Ensure installation environment meets specifications (temperature: -40°C to +70°C; humidity ≤95% non-condensing) |
2 | Verify flowmeter arrow direction matches fluid flow direction |
3 | Install supporting pipe brackets within 1 meter upstream/downstream to minimize mechanical stress |
4 | Use compatible gaskets matching process media (PTFE/graphite for corrosive fluids) |
5 | Maintain minimum straight pipe runs (10D upstream/5D downstream from electrodes) |
6 | Ground sensor properly using dedicated grounding lug (10 AWG minimum wire) |
7 | Connect transmitter using shielded twisted pair cable (18-12 AWG) with separate conduit for power/signal |
8 | Configure transmitter settings via AMS TREX device: set units, density parameters, output scaling |
9 | Perform zero calibration with filled/no-flow condition (fluid temperature must stabilize ±2°C) |
10 | Conduct flow verification using Hart communicator (check PV, SV, TV values) |
11 | Apply insulation jacket if operating below ambient dew point |
12 | Implement lightning protection for outdoor installations (Class II surge arrestors) |