Customization: | Available |
---|---|
Customized: | Customized |
Certification: | CE |
Still deciding? Get samples of $ !
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Step | Procedure |
1 | Power off the valve and disconnect air supply before installation. |
2 | Mount the SVI2 positioner on the valve yoke using appropriate hardware. |
3 | Connect 4-20mA control signal wires to terminals 1(+) and 2(-). |
4 | Connect air supply (1.4-7 bar) to port SUPPLY. |
5 | Link valve stem to positioner feedback shaft using provided linkage. |
6 | Power on and perform automatic setup: |
- Press MODE button until "AUTOSET" displays | |
- Press ENTER to start self-calibration | |
7 | Manual calibration (if required): |
- Use UP/DOWN arrows to set 0% and 100% positions | |
- Confirm with ENTER button | |
8 | Configure parameters via HART communicator if needed (e.g. response speed, fail-safe action). |
9 | Test operation through full travel range using control signal. |
10 | Verify position accuracy with local indicator and process feedback. |